Quantity, Measurement and the Barrel
Stage A, Orientation. Level 2 of 10.
Volume and temperature correction, density, basic sediment and water, gauging, outturn, and which figure the contract makes binding.
121 chapters · 11 modules · builds on: Course 01
One chapter is one idea taken to the point of use
Each chapter covers one idea to the point where you can use it, and comes two ways: a narrated explainer, and a deep dive audio discussion of around thirty minutes that works the same material at depth.
Chapters run in order: each one assumes only what the chapters before it taught, and capability belonging to a later course is named and deferred rather than half-covered.
This page describes one course within the academy. Delivery modes - self-paced, cohort and enterprise - are offered at academy level, where the twenty courses are taken as a programme.
11 modules · 121 chapters
Open any module for its full chapter list, in teaching order.
M0 Quantity as a Determined Figure Ch 1-10
- Quantity as the Output of a Procedure
- The Measurement Standards That Govern the Numbers
- Static and Dynamic Measurement Compared
- Traceability, Calibration and Why Equipment Can Be Trusted
- Uncertainty: Stating What a Figure Can Support
- Repeatability, Reproducibility and Bias
- Rounding, Significant Figures and the Order of Operations
- The Measurement Ticket and the Certificate of Quantity
- Who Measures, Who Witnesses and Who Signs
- The Determination Chain for One Cargo
M1 Density and the Gravity Scales Ch 11-20
- Density at Observed Temperature and at Reference
- API Gravity Arithmetic
- Hydrometer Determination and Its Error Sources
- Digital Density Meters and Reference Methods
- Density on a Composite Sample
- Blend Density: Volume Weighting Against Mass Weighting
- Weight in Air and Mass in Vacuum
- Density Errors and Their Cash Consequence
- Viscosity, Pour Point and Measurability
- Reading a Density Report Critically
M2 Volume Correction and the Standard Tables Ch 21-32
- Thermal Expansion and the Correction Factor
- Choosing the Correct Correction Table
- Total Observed Volume: Where the Chain Begins
- Gross Standard Volume and the Correction Step
- Net Standard Volume and the Deduction
- Pressure Correction and When It Applies
- Tank Shell Correction
- The Full Correction Sequence, Worked
- Sequencing Errors and Double Correction
- Metric and Customary Practice Side by Side
- Where the Tables Stop Working
- Auditing a Correction Calculation
M3 Static Tank Gauging Ch 33-44
- Tank Capacity Tables and How They Are Built
- Tank Reference Height and the Datum Plate
- Innage Gauging to the Millimetre
- Ullage Gauging and Its Arithmetic
- Finding the Water Interface in a Tank
- Temperature Determination in a Tank
- Floating Roof Correction
- Automatic Tank Gauging Against Manual Gauging
- Tank Bottoms, Dead Stock and Heel
- The Opening and Closing Gauge Comparison
- Line Displacement and the Pipework Between
- The Uncertainty Budget for a Tank Transfer
M4 Dynamic Measurement and Meter Proving Ch 45-56
- Flow Meters and What Each Type Measures
- The Meter Factor and Why Meters Are Never Exact
- Proving With a Pipe Prover
- Master Meter and Tank Proving Methods
- The Meter Factor Curve and Linearity
- Flow Computers and the On-Line Correction Chain
- Temperature, Pressure and Density at the Meter
- Proving Frequency and the Contractual Obligation
- Meter Drift and Retrospective Correction
- Custody Metering Against Allocation Metering
- Proving Records as Evidence
- Meter Measurement Uncertainty Against Tank Gauging
M5 Sampling Ch 57-66
- Why the Sample Governs the Figure
- Spot, Running and All-Levels Samples
- Zone Sampling and Upper, Middle, Lower Practice
- Automatic In-Line Samplers
- Sample Receivers, Mixing and Withdrawal
- Building a Composite Sample
- Sample Handling, Labelling and Chain of Custody
- Retained Samples and Their Later Role
- Sampling for Water Against Sampling for Analysis
- Diagnosing a Sampling Failure
M6 Water and Sediment Determination Ch 67-76
- The Forms Water Takes in Crude
- Centrifuge Determination of Water and Sediment
- Distillation Method for Water Content
- Coulometric Titration for Low Water Levels
- Sediment Determination by Extraction and Filtration
- Why Two Laboratories Report Different Water
- Free Water Gauged and Water Analysed Together
- Salt Content and Its Measurement
- The Net Deduction and What Payment Excludes
- Water Determination Written Into an Agreement
M7 Mass, Units and Cross-Checking Ch 77-86
- Converting Standard Volume to Mass
- Barrels, Cubic Metres, Tonnes and Long Tons
- Weight Conversion Factors and Barrels Per Tonne
- Cross-Checking the Volume Route Against the Mass Route
- Mass-Based Custody Transfer
- Measuring in One Unit and Invoicing in Another
- Vapour, Light Ends and Volume That Leaves
- Expressing the Same Cargo Four Ways
- Reconciling a Multi-Parcel Cargo
- Unit Conventions Across Trading Regions
M8 Ship Figures, Shore Figures and the Reconciliation Ch 87-98
- Vessel Tank Calibration Tables
- Sounding a Cargo Tank
- Trim and List Corrections
- On-Board Quantity Before Loading
- Remaining On Board After Discharge
- Slops, Washings and Mixed Residues
- Computing a Vessel Experience Factor
- Using and Misusing the Experience Factor
- Calculating the Ship and Shore Difference
- When a Difference Is Investigable
- The Letter of Protest as a Measurement Record
- A Worked Load Port Reconciliation
M9 Outturn and Loss Accounting Ch 99-110
- Outturn: The Figure at the Receiving End
- Transit Difference and How It Is Expressed
- Separating Physical Loss From Measurement Difference
- Evaporation and Vapour Loss in Transit
- Clingage, Retention and Tank Wetting
- Pipeline Linefill and Interface Losses
- Terminal Gains and Losses on Tank-to-Tank Movement
- Loss Allowance Clauses and Expected Difference
- Building a Loss Account Across the Whole Chain
- Apportioning an Unexplained Difference
- Reconciling Receipt Into a Commingled Tank
- Loss Norms and What Counts as Normal
M10 Which Figure Binds, and the Limits Ch 111-121
- The Quantity Determination Provision
- Bill of Lading Quantity as the Payment Basis
- Outturn as the Payment Basis
- Appointing the Inspector and Binding the Result
- Determination by a Second Opinion
- Figures Final Clauses and Their Exceptions
- Evidencing a Discrepancy at the Time It Arises
- The Quantity Evidence Pack
- A Worked Chain, Part One: Load Port Determination
- A Worked Chain, Part Two: Outturn and the Account
- What Measurement Cannot Settle
The brochure gives each of these 121 chapters a paragraph on what it covers and what you can do once you have worked through it.
This is course 2 of twenty
It stands alone, and it is also the entry point to the Crude Oil Desk Academy pathway.