MW, MWh, Time Blocks & Load Shapes
Stage A, Electricity foundations. Level 1 of 10.
The conversion between capacity, energy and time blocks, and the reading of a half-hourly or hourly load shape.
114 chapters · 11 modules · builds on: Course 01
One chapter is one idea taken to the point of use
Each chapter covers one idea to the point where you can use it, and comes two ways: a narrated explainer, and a deep dive audio discussion of around thirty minutes that works the same material at depth.
Chapters run in order: each one assumes only what the chapters before it taught, and capability belonging to a later course is named and deferred rather than half-covered.
This page describes one course within the academy. Delivery modes - self-paced, cohort and enterprise - are offered at academy level, where the twenty courses are taken as a programme.
11 modules · 114 chapters
Open any module for its full chapter list, in teaching order.
M0 Two Units, One Desk Ch 1-9
- The Two Numbers on Every Power Trade
- Capacity as a Rate, Energy as an Accumulation
- Electricity as a Flow That Cannot Wait
- Why the Hour Became the Market's Unit of Account
- The Shape of a Load and Why Power Has One
- A Volume With No Time Stamp Is Not a Position
- The Unit Vocabulary a Power Desk Expects
- Three Unit Errors That Reached an Invoice
- What Counting Settles and What It Hands to Others
M1 The Core Conversion Between Megawatts and Megawatt Hours Ch 10-19
- Megawatts Multiplied by Hours, Worked Slowly
- From Kilowatts to Gigawatts Without Losing a Factor
- Reading an Average Megawatt Figure Correctly
- Dividing Energy by Hours to Recover a Rate
- The Megawatt Day and Other Composite Units
- Annualising and De-Annualising a Power Quantity
- Counting the Hours in a Month, Quarter and Year
- Leap Years, Odd Months and the Hour Count
- Rounding, Decimals and an Auditable Arithmetic Trail
- A Conversion Chain Worked in Both Directions
M2 Clocks, Days and Settlement Periods Ch 20-29
- The Half Hour as One Commercial Interval
- Hourly and Half-Hourly Markets Side by Side
- The Delivery Day and Where Its Boundary Falls
- Local Time, Standard Time and the Trader's Clock
- The Short Day When the Clocks Go Forward
- The Long Day When the Clocks Go Back
- Timestamp Conventions: Period Start or Period End
- Finer Intervals and Energy Preserving Aggregation
- Aligning Two Series Recorded on Different Clocks
- A Clock-Change Weekend Reconciled Period by Period
M3 Standard Time Blocks and the Block Calendar Ch 30-40
- What a Time Block Is, Arithmetically
- Baseload as Every Interval in the Period
- Peak Windows and the Working Week
- Off-Peak as the Complement of Peak
- Extended Peak, Super-Peak and Narrow Windows
- Weekends and Public Holidays Inside a Block
- Counting the Peak Intervals in a Delivery Month
- The Block Hour Table You Build Once and Reuse
- Turning a Block Rate Into a Period Volume
- Rebuilding Baseload From Two Block Quantities
- A Full Delivery Year Mapped Into Blocks
M4 Capacity Measures and Factors Ch 41-50
- Nameplate, Net and Available Capacity Distinguished
- De-Rated Capacity and What the Haircut Represents
- Load Factor Computed From a Metered Total
- Capacity Factor for a Generating Unit
- Utilisation Hours and Equivalent Full-Load Hours
- Running Hours Against Energy Delivered
- Minimum Stable Generation as a Megawatt Floor
- Ramp Rate Measured in Megawatts per Minute
- Why a High Factor Is Not Automatically Good
- Factors Computed for One Site and One Unit
M5 Reading a Half-Hourly Series Ch 51-61
- What a Half-Hourly Data File Actually Contains
- Import, Export and the Sign of a Reading
- Metered Energy Against Instantaneous Demand
- Estimated Reads, Gaps and Silent Zeroes
- Spikes, Negative Values and Impossible Readings
- Cleaning a Series Without Destroying the Evidence
- Where a Shape Comes From Without an Interval Meter
- Revisions and Why Yesterday's Shape Changed
- Aggregating Intervals Into Hours, Days and Months
- Checking an Interval Series Against a Billed Total
- One Site, One Month, Read End to End
M6 The Anatomy of a Load Shape Ch 62-72
- The Morning Rise and What Sets Its Slope
- The Evening Peak and What Drives It
- The Overnight Trough and Standing Demand
- Weekday and Weekend Shapes Compared
- Seasonal Shape Across a Full Year
- Temperature Response Read Off Interval Data
- Daylight, Shift Patterns and Non-Weather Drivers
- Reading an Industrial Process Off the Shape
- Flat Shapes, Spiky Shapes and Why It Matters
- The Net Shape After Behind-the-Meter Generation
- Four Shapes Compared Side by Side
M7 Shape Statistics and the Load Duration Curve Ch 73-82
- Building a Load Duration Curve From a Year of Intervals
- Reading Base, Middle and Peak Off the Curve
- The Peak Half Hour and Where It Falls
- Coincident and Non-Coincident Peak Demand
- Measuring the Diversity Between Two Loads
- Percentiles of a Shape and What They Report
- Variability and Volatility of an Interval Series
- The Shape Factor Against a Baseload Reference
- Peak to Trough Ratio and Swing in Megawatts
- A Duration Curve Used to Size a Flat Supply
M8 Generation and Storage Output as Shapes Ch 83-92
- A Thermal Unit's Output as an Interval Series
- The Wind Output Shape and Its Hour-to-Hour Variation
- The Solar Output Shape Across a Day and a Year
- Hydro and Run-of-River Output Patterns
- Battery Charge and Discharge in One Series
- Outages, Trips and Zeroes in an Output Record
- Metered Output Against Scheduled Output
- Gross Output, Works Power and Net Export
- Combining Several Units Into One Station Shape
- A Mixed Generation Portfolio Added Together
M9 Netting, Restating and Block-Equivalent Shapes Ch 93-103
- Adding Two Shapes Interval by Interval
- Netting a Supply Shape Against a Generation Shape
- The Residual Shape and What It Looks Like
- Scaling a Shape to a Different Annual Volume
- Shifting a Shape Onto a Different Calendar Year
- Turning a Monthly Total Back Into a Shape
- Fitting a Baseload Block to a Shaped Volume
- Adding a Peak Block and Measuring What Remains
- The Block-Equivalent Statement of a Shape
- When a Block Restatement Misleads
- A Supply and Generation Book Netted to One Series
M10 Shape Arithmetic in Practice, and Its Limits Ch 104-114
- The Volume Pack a Desk Circulates Each Morning
- Checking a Counterparty's Volume Statement
- Spotting a Unit Error in Someone Else's File
- Documenting a Shape So Another Desk Can Reuse It
- A Worked Case: One Factory and One Wind Farm, Part One
- A Worked Case: One Factory and One Wind Farm, Part Two
- A Worked Case: One Factory and One Wind Farm, Part Three
- What Last Year's Shape Cannot Tell You About Next Year
- The Arithmetic That Is Really an Assumption
- Where Counting Stops and Valuation Begins
- What a Later Desk Will Expect You to Already Know
The brochure gives each of these 114 chapters a paragraph on what it covers and what you can do once you have worked through it.
This is course 2 of twenty
It stands alone, and it is also the entry point to the Power and Electricity Desk Academy pathway.