Cross-Border Power & Interconnector Economics
Stage D, Specialised products and regional practice. Level 8 of 10.
Cross-border flow, interconnector capacity allocation and price coupling economics.
122 chapters · 11 modules · every chapter one 8 to 10 minute explainer · builds on: Course 03, Course 09, Course 17
One chapter is one idea taken to the point of use
Each chapter is a single self-contained explainer of 8 to 10 narrated minutes, covering one idea to the point where you can use it.
Chapters run in order. Each one assumes only what the chapters before it taught, and capability belonging to a later course is named and deferred rather than half-covered.
11 modules · 122 chapters
Open any module for its full chapter list, in teaching order.
M0 The Border as a Commercial Fact Ch 1-11
- Two Systems, Two Prices, One Cable
- What an Interconnector Actually Sells
- Entitlement, Energy and the Two Purchases
- Why Borders Get Their Own Market
- Who Stands on Each Side of a Crossing
- The Three Conditions for a Paying Crossing
- Scheduled Exchange Versus the Physics
- Where Money Collected at a Border Ends Up
- Direction, Reversal and the Daily Question
- The Working Vocabulary of a Border Desk
- First Pass Over an Unfamiliar Border
M1 Links, Owners and Operators Ch 12-22
- Synchronous Borders and Their Many Parallel Paths
- Controllable Links and the Set-Point
- Converter Stations and the Fixed Cost of Crossing
- One Asset, Two Jurisdictions
- Regulated Links and the Revenue They Are Allowed
- Merchant Links and the Exemption Bargain
- The Cap and Floor Arrangement
- Losses on the Wire and Who Absorbs Them
- Derating, Availability and a Shrunken Offer
- Coordinating an Outage Across Two Regimes
- The Publication Trail a Crossing Leaves
M2 How Much a Border Can Carry Ch 23-33
- Thermal, Voltage and Stability Limits
- Total Transfer Capability, Built Up
- The Security Margin and What It Buys
- The Net Figure as a Negotiated Outcome
- Why the Offered Quantity Moves Hourly
- Remedial Action and the Quantity It Releases
- Unscheduled Flow Across a Neighbour
- Trading Through a System You Did Not Buy
- The Argument Over a Minimum Offer
- Remaining Margin After Prior Allocation
- Reading a Carrying Forecast Sceptically
M3 Buying the Right to Cross Ch 34-45
- Splitting the Crossing From the Energy Trade
- Entitlement as a Tradable Instrument
- Where Border Rights Are Sold, and When
- The Product Ladder From Annual to Daily
- Constructing a Bid Curve for Entitlement
- How Entitlement Clears and What You Pay
- Nomination Deadlines and Lapsed Rights
- Automatic Resale of Unused Entitlement
- Declaring a Crossing Against What You Hold
- Reselling Into the Secondary Market
- Admission, Guarantees and Bidding Limits
- A Worked Purchase of Annual Entitlement
M4 Coupling the Two Markets Together Ch 46-57
- What the Split Purchase Gets Wrong
- Allocating the Border Inside the Energy Auction
- What the Coupling Calculation Is Asked to Do
- Net Export Curves and a Zone's Appetite
- Convergence: When Neighbours Share a Price
- The Spread as the Price of the Last Megawatt
- Working Out Congestion Revenue
- Order Types the Calculation Must Respect
- Decoupling: When the Calculation Fails
- The Fallback Allocation
- Firmness, the Deadline and Compensation
- A Worked Coupled Hour Across Three Zones
M5 Scheduling and Delivering a Crossing Ch 58-68
- From Executed Trade to Confirmed Exchange
- Matching Schedules Between Two Operators
- Finding and Vetting a Party on the Far Side
- Balance Responsibility on Both Sides
- When Exchange and Metering Diverge
- Trading a Border After the Day-Ahead Result
- Working Against a Shrinking Margin
- Capacity Revisions Inside the Delivery Day
- Deadlines That Do Not Line Up
- Clocks, Zones and the Hour That Vanishes
- A Crossing Walked From Trade to Delivery
M6 Border Rights as Hedging Instruments Ch 69-79
- Financially Settled Rights Against Physical Ones
- The Payoff of a Right at Settlement
- Options and Obligations on the Same Border
- Pricing a Right From the Spread Distribution
- Covering a Delivered Obligation Across a Border
- The Gap Between the Right and Your Exposure
- Curtailment of a Right and What Follows
- Valuing a Held Right Between Auctions
- Exiting a Long-Dated Border Position
- A Border Right Against a Forward Abroad
- A Worked Hedge Using Long-Dated Cover
M7 The Economics of a Single Crossing Ch 80-90
- Assembling the Delivered Cost of a Crossing
- Charges That Are Not in the Spread
- Gross, Net and the Breakeven Difference
- The Short-Dated Product as an Option
- Why a Year Is Worth Less Than Its Days
- Expected Value of Holding Cover
- A Border Arbitrage, Part One: the Case
- A Border Arbitrage, Part Two: the Outturn
- Backing the Wrong Direction
- Thin Differences and the Refusal to Trade
- Choosing Between Two Borders
M8 Allocation by Domain Rather Than Limit Ch 91-101
- From One Number to a Feasible Region
- Monitored Elements and the Faults Assumed
- Distribution Factors, Explained Plainly
- The Reference Case Behind the Region
- Pre-Processing and Operator Adjustments
- Extra Constraints Imposed on the Result
- Flows That Run the Unprofitable Way
- Reading a Published Region
- Estimating the Room Left for Your Position
- Price Patterns a Region Produces
- The Limits of a Domain Model for Trading
M9 Borders That Do Not Behave Ch 102-112
- Selling Into a Market That Is Not Joined
- A Non-Member System on the Far Side
- Links Into an Isolated System
- Quarter-Hours on One Side, Hours on the Other
- Two Currencies, One Difference
- Asymmetric Rules and the Weaker Side
- A Crossing Into a Nodally Priced System
- When the Neighbour Holds No Day-Ahead Auction
- Political Interruption and Emergency Restriction
- A Border Whose Design Changes Mid-Contract
- Opening a Border Nobody on the Desk Knows
M10 Putting a Whole Border Together Ch 113-122
- A Border Book, Part One: the Position
- A Border Book, Part Two: Securing Cover
- A Border Book, Part Three: the Result
- A Coupling Failure and Its Damage
- Expected Revenue Against Realised
- Reviewing a Border Portfolio Quarterly
- Questions to Settle Before a New Border
- Handing a Border Position to a Colleague
- Where Border Economics Stops Being Useful
- Closing: the Border as a Priced Decision
The brochure gives each of these 122 chapters a paragraph on what it covers and what you can do once you have worked through it.
This is course 18 of twenty
It stands alone, and it is also the entry point to the Power and Electricity Desk Academy pathway.