PPA Types & Delivery Structures
Stage A, Origination foundations. Level 1 of 10.
The taxonomy of delivery routes, covering on-site, private wire, sleeved, grid-delivered and virtual, and what separates each legally and operationally.
119 chapters · 11 modules · every chapter one 8 to 10 minute explainer · builds on: Course 01
One chapter is one idea taken to the point of use
Each chapter covers one idea to the point where you can use it, and comes two ways: a narrated explainer, and a deep dive audio discussion of around thirty minutes that works the same material at depth.
Self-paced throughout, and the same chapters can be taught as a cohort. Chapters run in order: each one assumes only what the chapters before it taught, and capability belonging to a later course is named and deferred rather than half-covered.
11 modules · 119 chapters
Open any module for its full chapter list, in teaching order.
M0 What a Delivery Route Decides Ch 1-10
- The Route Question Sits Before the Price Question
- The Seat Every Chapter Is Written From
- Five Delivery Routes Named Once, Then Taken Apart
- What All Five Routes Share
- Electrons, Title and Money as Three Separate Flows
- Why Two Deals Called the Same Thing Are Not
- The Working Vocabulary of Routes and Parties
- Permission Comes Before Preference
- What Each Route Hands On to a Later Course
- Reading an Enquiry to Find Its Route
M1 The Tests That Separate the Routes Ch 11-20
- Does Any Electricity Reach This Buyer At All
- Whose Wires the Electricity Travels Along
- Who Holds the Supply Licence or an Exemption
- Who Carries Balance Responsibility for the Volume
- Where Title Passes and What the Buyer Then Owns
- Is the Buyer a Party to the Generator's Contract
- Counting the Contracts a Structure Really Creates
- The Measurement Point Each Route Invoices Against
- Six Tests Applied to One Real Structure
- A Classification Sheet for the Deal File
M2 On-Site Generation Inside the Buyer's Boundary Ch 21-31
- Generation Behind the Buyer's Boundary Meter
- The Roof the Buyer Does Not Own
- Occupation Rights the Generator Must Secure
- The Boundary Meter as the Edge of the Deal
- Self-Consumed Volume and What It Displaces
- The Surplus Nobody Contracted For
- Contract Term Against Tenure of the Site
- Landlord, Tenant and the Party That Consumes
- Self-Consumption Regimes, Named by Market
- Net Metering and Net Billing Are Not a Power Purchase Agreement
- When On-Site Capacity Cannot Cover the Site
M3 Private Wire and the Direct Connection Ch 32-42
- A Cable Built Between Two Private Parties
- Private Networks and Embedded Networks Compared
- Crossing Land That Belongs to Somebody Else
- Wayleaves, Easements and Statutory Powers
- Who Owns, Operates and Repairs the Wire
- The Single Buyer a Private Wire Locks You To
- Top-Up and Standby Supply Behind the Wire
- Supplying Without a Full Licence
- Captive Generation as a Statutory Category
- When the Private Wire Fails
- Private Wire Against Grid Delivery, Honestly Compared
M4 Grid-Delivered Physical Supply Ch 43-54
- Delivery Across the Public Network
- Why a Generator Cannot Simply Invoice a Factory
- The Licensed Supplier as a Necessary Party
- The Sleeve Named, Its Mechanics Deferred
- Two Contracts, Three Parties, One Meter
- What the Supplier Must Still Provide
- Pass-Through Against Independently Priced Supply
- Utility Programmes That Package a Route
- Open Access and Wheeling as a Statutory Right
- Direct Marketing of Output Into the Market
- The Buyer That Holds Its Own Market Access
- Grid Delivery and the Claim It Supports
M5 The Virtual Route: Money Without Electrons Ch 55-66
- A Contract That Delivers Nothing
- Why the Buyer Keeps Its Existing Supplier
- The Reference Price as the Only Link
- Virtual, Synthetic and Financial: Three Names
- How the Generator Still Reaches the Market
- Attributes Moved Without Any Delivery
- Crossing a Border With No Physical Consequence
- The Point the Settlement Names
- Derivative or Not, and Why It Matters
- Hedging Intent and the Mandate That Permits It
- What a Virtual Structure Cannot Do
- A Virtual Offer and a Sleeved Offer, Compared
M6 Permission: What Each Market Allows Ch 67-78
- The Licence as the Gate on Physical Routes
- Supplying Under an Exemption Rather Than a Licence
- Third-Party Access: the Right Behind Every Route
- Active Customers and Self-Consumers in European Law
- Communities and Shared Generation Schemes
- Markets Where No Route Exists
- Retail Competition as a Precondition for Choice
- Charges Designed to Discourage a Route
- Grandfathering and the Route That Closes Behind You
- Reading an Unfamiliar Market for Route Availability
- One Mandate, Two Countries, Two Answers
- The Permission Note Every Deal File Needs
M7 Metering, Title and the Point of Delivery Ch 79-88
- Writing the Delivery Point Into the Contract
- The Moment Electricity Becomes the Buyer's
- Settlement-Grade Metering and Who Reads It
- Splitting One Export Meter Between Buyers
- Losses Between the Plant and the Factory
- Export Meter Against Import Meter
- When the Data Does Not Arrive
- Which Routes Need Interval Data and Which Do Not
- The Connection Agreement as a Constraint
- An Evidence Chain From Meter to Invoice
M8 Charges, Levies and the Avoided-Cost Argument Ch 89-98
- What a Route Avoids Is Not What It Saves
- Network Charges and the Route That Bypasses Them
- Policy Levies Collected Through the Electricity Bill
- The Embedded Benefit Argument and Its Assumptions
- Cross-Subsidy and the Regulator's Objection
- Charges That Follow the Consumer Whatever the Route
- Imbalance Exposure Named by Route
- The Intermediary's Fee, Named and Deferred
- Comparing Delivered Cost Across Routes on One Basis
- An Avoided-Charge Claim You Can Defend
M9 Variants, Hybrids and Lookalikes Ch 99-109
- One Generator, Several Corporate Buyers
- One Buyer, Several Generating Assets
- The Anchor Offtaker and the Residual Buyer
- Pairing a Financial Deal With a Physical One
- Part Sleeved, Part Grid: the Layered Structure
- The Party in the Middle and Why It Is There
- Green Tariffs Are Not Power Purchase Agreements
- Buying Certificates Without Buying Power
- Government Support Contracts Are a Different Animal
- Merchant Exposure and the Floor a Buyer Can Offer
- Naming a Structure Nobody Can Misread
M10 Choosing a Route, Worked End to End Ch 110-119
- The Situation: a Manufacturer With Three Sites
- Eliminating Routes Before Comparing Them
- The On-Site Option at the Owned Plant
- The Private Wire Option and the Land Between
- The Sleeved Option and the Supplier's Answer
- The Virtual Option and the Treasury's Answer
- The Route Recommended and the Risks Accepted
- The Same Case With the Licensing Rule Changed
- What Route Classification Cannot Decide
- The Threads Each Later Course Takes Up
The brochure gives each of these 119 chapters a paragraph on what it covers and what you can do once you have worked through it.
This is course 2 of twenty
It stands alone, and it is also the entry point to the Power Origination and PPA Desk Academy pathway.