Course 14 of 20 · Battery and Flexibility Desk Academy

Co-Located Renewables & Storage

Stage D, Multi-asset and portfolio specialisation. Level 7 of 10.

Shared-connection co-location: metering boundaries, capacity allocation between generation and storage, and contractual priority between them.

124 chapters · 11 modules · every chapter one 8 to 10 minute explainer · builds on: Course 04, Course 06, Course 09

Enrol or enquire See the 124 chapters
How a chapter is delivered

One chapter is one idea taken to the point of use

Each chapter covers one idea to the point where you can use it, and comes two ways: a narrated explainer, and a deep dive audio discussion of around thirty minutes that works the same material at depth.

Self-paced throughout, and the same chapters can be taught as a cohort. Chapters run in order: each one assumes only what the chapters before it taught, and capability belonging to a later course is named and deferred rather than half-covered.

Curriculum

11 modules · 124 chapters

Open any module for its full chapter list, in teaching order.

M0 One Connection, Two Machines, Three Allocations Ch 1-11
  1. One Connection Point, Two Businesses Behind It
  2. Co-Location Is an Allocation Problem Before It Is an Engineering One
  3. The Three Seats and Why a Term Reads Differently in Each
  4. Granted By, Held By: The Notation Used Throughout
  5. The Connection Envelope Taken as Given
  6. The Charge and Discharge Decision Assumed, Not Rebuilt
  7. The Revenue Stack Assumed From the Start
  8. Where the Offtake Contract Begins and This Material Ends
  9. The Three Questions Any Co-Location Arrangement Must Answer
  10. Why Sharing a Connection Looks Cheaper Than It Contracts
  11. The Order This Material Works In
M1 The Electrical Arrangement and What It Makes Separable Ch 12-21
  1. Alternating-Current Coupling and Two Separately Measurable Machines
  2. Direct-Current Coupling and the Single Quantity It Produces
  3. The Oversized Array and the Energy the Inverter Refuses
  4. The Shared Transformer and the Boundary It Creates
  5. Where the Battery Sits Relative to the Limiting Device
  6. Auxiliary Load as the Third Consumer on Site
  7. Night Load on a Solar Site With a Battery Beside It
  8. A Topology Chosen for Capital Cost and Paid for Later
  9. What the Electrical Arrangement Settles and What It Only Influences
  10. Reading a Single-Line Diagram for Allocation Consequences
M2 The Metering Estate and Where Its Boundaries Fall Ch 22-33
  1. The Connection Point Meter and What It Nets Away
  2. A Meter at Each Machine's Terminals
  3. The Settlement Meter and the Commercial Meter Are Not the Same Device
  4. Netting at the Boundary and the Information It Destroys
  5. Sub-Metering: What It Proves and What It Costs
  6. Calculated Allocation Where No Meter Exists
  7. Import Measured Apart From Export
  8. Proving the Battery Charged From the Array
  9. Accuracy Class and the Dispute It Decides in Advance
  10. A Failed Meter and the Substitution Rule
  11. Who Owns, Reads and Certifies Each Device
  12. An Illustrative Metering Estate Mapped End to End
M3 Registration: One Resource or Two Ch 34-44
  1. Registration Decides What the Market Thinks It Is Dispatching
  2. A Single Registered Unit and the Netted Position
  3. Two Registered Units Behind One Connection
  4. What Registration Does to the Charging Question
  5. Nodal Registration of a Co-Located Pair in Texas
  6. Great Britain's Settlement Registration for a Shared Site
  7. Integrated Resource Registration in Australia's National Electricity Market
  8. Hybrid Resource Registration in California
  9. Choosing a Registration Where the Market Allows Both
  10. Adding a Battery to a Site Already Registered as a Generator
  11. What Registration Cannot Change
M4 Dividing One Connection's Capacity Ch 45-56
  1. Export Headroom as a Finite Shared Resource
  2. Each Machine Given the Whole Limit
  3. A Fixed Split of the Export Limit
  4. Dynamic Sharing and the Headroom the Generator Leaves
  5. Rating the Battery to the Gap, Not to the Limit
  6. Export Capacity Granted by the Connection Holder
  7. Who Holds the Right to Unused Headroom
  8. The Import Allowance and Its Separate Division
  9. Auxiliary Draw Taken Out of the Import Share
  10. A Non-Firm Share Inside a Firm Connection
  11. Testing Whether the Division Was Respected
  12. An Illustrative Headroom Ledger Across One Day
M5 Priority When Both Machines Want the Same Megawatt Ch 57-68
  1. The Binding Hour and the Question It Forces
  2. Generation First: The Battery Curtailed Before the Array
  3. Storage First: The Array Curtailed Before the Battery
  4. Cutting Both Machines Together
  5. Economic Priority and Who Is Trusted to Rank the Hours
  6. A Network Instruction That Overrides Both Owners
  7. Priority Held Against Priority Granted
  8. A Ranking That Reverses by Season or by Hour
  9. Reserved Headroom as a Standing First Claim
  10. Priority to Charge Is Not Priority to Discharge
  11. Paying the Machine That Gave Way
  12. One Binding Hour Resolved Four Ways
M6 Where the Battery Charges From Ch 69-79
  1. Two Sources, One Battery, Different Arrangements
  2. Charging Restricted to the Machine Beside It
  3. Charging Across the Boundary and the Import It Consumes
  4. Evidence of Source and Who Keeps It
  5. Exporting and Charging in the Same Minute
  6. Where the Round-Trip Loss Is Measured on Site
  7. Capturing the Clipped Energy Into Storage
  8. The Records a Legacy Charging Condition Demanded
  9. A Source Restriction That Binds in the Hours That Matter
  10. Switching Source Mid-Term and the Consents It Needs
  11. Reading a Charging Arrangement for Who Chooses and Who Pays
M7 The Control Scheme That Enforces the Allocation Ch 80-90
  1. A Priority Rule Needs a Device to Enforce It
  2. The Export Limiting Scheme and Its Setpoint
  3. Response Time and the Overshoot the Network Sees
  4. Who Configures the Scheme and Who May Change It
  5. Headroom Reserved in Software Rather Than on Paper
  6. The Scheme That Trimmed the Wrong Machine
  7. Overriding the Scheme and the Record It Leaves
  8. When the Scheme Itself Fails
  9. Telemetry and What Each Owner Is Entitled to See
  10. Auditing the Configuration Against the Agreement
  11. Holding the Allocation in an ETRM
M8 When the Two Machines Have Different Owners Ch 91-102
  1. Two Owners, One Connection, No Shared Interest
  2. The Co-Location Agreement and What It Allocates
  3. Leasing Export Capability From the Connection Holder
  4. Buying Rank Rather Than Quantity
  5. Splitting the Cost of Shared Equipment
  6. The Land, the Access and the Easement the Battery Needs
  7. Two Operators at One Control Room
  8. Liability Where the Two Estates Meet
  9. The Network Operator Wants One Counterparty
  10. When the Connection Holder Defaults
  11. Consent Rights When One Owner Wants to Change Something
  12. Reading a Co-Location Agreement for Direction
M9 What the Allocation Does to the Flexibility Business Ch 103-112
  1. Volume the Battery Can No Longer Offer
  2. A Commitment Sold Against Headroom Nobody Reserved
  3. Declaring Availability on a Shared Connection
  4. A Site-Wide Failure Against a Single Machine's Failure
  5. Scheduling Work on Equipment Neither Owner Solely Controls
  6. Dividing the Network Charges a Shared Connection Attracts
  7. What the Allocation Itself Is Worth
  8. The Co-Located Battery Against the Standalone One
  9. Guarantees Written Over a Shared Entitlement
  10. What a Co-Located Pair Hands to a Portfolio
M10 A Worked Co-Located Site, the Inversion Audit and the Limits Ch 113-124
  1. The Brief: A Battery Added Behind an Operating Solar Site
  2. Choosing the Coupling and the Meters for the Case
  3. Electing a Registration for the Case
  4. Dividing the Limit, Part One: The Shares Agreed
  5. Dividing the Limit, Part Two: The Ranking Agreed
  6. Configuring the Scheme to Match What Was Agreed
  7. The Day the Arrangement Did Not Hold
  8. Reading the Whole Arrangement Back for Direction
  9. The Three Terms That Contradict Each Other
  10. The Questions to Settle Before Anyone Signs
  11. The Co-Location Questions the Market Has Not Settled
  12. What an Allocation Cannot Do

The brochure gives each of these 124 chapters a paragraph on what it covers and what you can do once you have worked through it.

This is course 14 of twenty

It stands alone, and it is also the entry point to the Battery and Flexibility Desk Academy pathway.