Regasification Capacity & Terminal Administration
Stage D, Assets, shipping and cargo redirection. Level 7 of 10.
Regasification capacity rights and terminal administration: berth windows, send-out nominations, unloading rights and secondary capacity release.
120 chapters · 12 modules · every chapter one 8 to 10 minute explainer · builds on: Course 06, Course 07, Course 12
One chapter is one idea taken to the point of use
Each chapter is a single self-contained explainer of 8 to 10 narrated minutes, covering one idea to the point where you can use it.
Chapters run in order. Each one assumes only what the chapters before it taught, and capability belonging to a later course is named and deferred rather than half-covered.
12 modules · 120 chapters
Open any module for its full chapter list, in teaching order.
M0 The Import Terminal as a Contracted Right Ch 1-10
- A Berth You Rent, Not a Jetty You Own
- Who Runs the Terminal and What It Sells
- The Three Things an Import Right Bundles
- Capacity Holder, Cargo Owner and User of Record
- Why a Cargo Buyer Needs Shore Access
- Import Capability as the Scarce End of the Chain
- What an Import Right Does Not Entitle You To
- Open Access and Exempt Terminals Side by Side
- How an Import Position Is Written Down
- Five Ways Shore Access Disappoints
M1 The Terminal Use Agreement Ch 11-20
- The Terminal Use Agreement as a Standing Contract
- Annual Capability and the Units It Is Sold In
- Term, Ramp-Up and the Twenty-Year Commitment
- The Reservation Charge That Runs Whether You Berth or Not
- Credit Standing as a Condition of Shore Access
- Assignment, Sublicensing and Change of Control
- Default, Suspension and Losing Your Slots
- Operating Rules Incorporated by Reference
- Liability for Damage to Jetty, Arm and Tank
- A Worked Reading of One Terminal Use Agreement
M2 What One Slot Grants Ch 21-30
- The Slot as the Atomic Unit of Import Capacity
- Cargo Size, Slot Size and the Mismatch Between Them
- Standard Slots and Non-Standard Cargoes
- Slot Bundles and the Annual Allocation Round
- Firm Slots and Interruptible Slots Compared
- The Slot Calendar and How a Year Is Divided
- Multi-Slot Holders and the Shared Facility
- A Slot Without a Cargo, a Cargo Without a Slot
- Bundled and Unbundled Terminal Services
- What One Slot Is Worth to You
M3 Berth Windows and How They Are Allocated Ch 31-40
- The Berth Window Defined in Hours
- How a Terminal Builds Its Berth Schedule
- Pro Rata, Historic and First-Come Allocation at a Jetty
- Requesting a Window Against a Slot You Hold
- Window Confirmation and What It Fixes
- Competing Ships at a Single Jetty
- Single-Berth and Multi-Berth Facilities
- Window Swaps, Shuffles and Mutual Accommodation
- Queue Priority When the Jetty Falls Behind
- A Worked Window Allocation Round
M4 The Unloading Right and Arriving Outside the Window Ch 41-50
- What the Unloading Right Actually Promises
- Presenting Before the Window Opens
- Arriving Late and Losing the Window
- The Operator's Right to Turn a Ship Away
- Vessel Compatibility and the Approval File
- Discharge Rate and the Hours Alongside
- Delay Caused by the Terminal, Not the Ship
- Berth Occupancy Overrun Charges
- A Missed Window and the Options Left
- Rebooking After a Failed Call
M5 Tank Allocation and the Storage Clock Ch 51-60
- Tank Space Allocated Against a Discharge
- The Clock That Starts When the Hoses Come Off
- Free Days and the Charge That Follows Them
- Commingled Tank and Notional Inventory
- Heel, Minimum Operating Level and Liquid You Cannot Draw
- Tank Top and the Facility That Cannot Take You
- Transferring Inventory Between Terminal Users
- Running the Clock Down Against Grid Demand
- Forced Send-Out When the Allowance Expires
- A Worked Holding Clock Over Twenty Days
M6 Boil-Off in the Terminal Tank Ch 61-68
- Why Liquid Keeps Boiling in a Shore Tank
- Shore Boil-Off as a Contractual Deduction
- Who Absorbs the Vapour, and When
- Recondensers, Fuel Gas and Where the Vapour Goes
- Boil-Off While You Wait for the Grid
- Energy Landed Against Energy Redelivered
- Budgeting Shore Losses Into a Landed Cost
- A Worked Vapour Reconciliation
M7 Send-Out Nomination and the Duty to Take Gas Away Ch 69-79
- Send-Out as an Obligation, Not an Option
- The Send-Out Nomination Cycle
- Minimum and Maximum Daily Rates
- Nominating a Flat Profile Against a Shaped One
- Redelivery at the Exit Flange
- Failing to Nominate and the Default Profile
- Send-Out Curtailment by the Operator
- Imbalance Between Nominated and Actual Gas
- The Interface With the Downstream Pipeline
- Capability You Must Hold on the Far Side
- A Worked Send-Out Week
M8 Interchangeability at the Receiving End Ch 80-89
- A Sound Cargo the Facility Cannot Accept
- The Grid Specification at the Exit Flange
- Wobbe Index and Why It Binds at Import
- Rich Cargoes, Lean Cargoes and the Receiving Mismatch
- Nitrogen Injection and Ballasting Send-Out
- Air Blending and Other Conditioning Kit
- Blending in Tank to Reach an Acceptable Mix
- Extraction and the Value It Releases
- Refusing a Cargo on Composition Grounds
- A Pre-Purchase Acceptability Screen
M9 Terminal Tariffs and What They Cost You Ch 90-99
- What a Published Terminal Tariff Contains
- The Capacity Charge on Reserved Slots
- The Commodity Charge on Energy Regasified
- Berthing, Discharge and Marine Service Fees
- Holding and Excess Holding Charges
- Self-Consumption Recovered in Kind
- Conditioning, Reload and Ancillary Charges
- Tariff Reviews and Indexation
- Building the All-In Cost of Landing One Cargo
- Comparing Two Facilities for the Same Parcel
M10 Secondary Release, Reload and the Floating Alternative Ch 100-111
- Why an Unused Slot Reaches the Market
- Use It or Lose It on Import Capability
- Offering a Slot Back to the Operator
- Bilateral Transfers Between Terminal Users
- Posting, Bidding and the Award of a Released Slot
- Pricing a Released Discharge
- Who Buys Secondary Capability, and Why
- Consent, Credit and Liability After a Transfer
- Reloading a Cargo Out of the Terminal
- The Reload Spread and When It Opens
- Floating Regasification as a Commercial Alternative
- Choosing Between a Shore Slot and a Moored Unit
M11 A Worked Terminal Year Ch 112-120
- The Case: One Facility, One Portfolio, One Year
- Securing the Capability, Part One: The Request
- Securing the Capability, Part Two: The Commitment
- Running the Year, Part One: Four Cargoes Landed
- Running the Year, Part Two: The Quarter the Jetty Closed
- Running the Year, Part Three: The Cargo That Would Not Fit
- The Terminal Account at Year End
- The Limits of a Capacity-Led View
- Where Your Import Right Is Used Next
The brochure gives each of these 120 chapters a paragraph on what it covers and what you can do once you have worked through it.
This is course 14 of twenty
It stands alone, and it is also the entry point to the LNG Desk Academy pathway.